2002

CIVIL,
MECHANICAL &
PIPING

Receiver — Launcher and Valve Station Construction Works involving Civil, Mechanical and Piping scopes for Mumbai — Manmad Extension project

Client:
Punj Lloyd Limited
Owner:
Bharat Petroleum Corporation Limited
Consultant:
Engineers India Limited

2003

CIVIL

Civil works in Effluent Disposal Glass Reinforced Line including Earth Works, Foundations, Thrust Blocks and other miscellaneous scopes

Client:
Aban Construction Private Limited
Owner:
Bharat Petroleum Corporation Limited

2004

HYDROTESTING

Testing of 16 inch Cross Country Pipeline in Mountaneous terraain with elevation differnces of 9500 meters for Vizag Bailadela Iron Ore Slurry Pipeline

Client:
Essar Construction
Owner:
Hydrate Pellets Limited

2005

CROSS-COUNTRY
PIPELINE

Cross-Country pipeline laying including Survey,Right of Way Grading, Stringing, Welding, NDT, Lowering, Backfilling and Restoration Narimanam-Kottalm Pipeline project, Tamil Nadu, India

Client:
Aban Construction Pvt. Ltd.
Owner:
Gas Authority of India Limited
Consultant:
Engineers India Limited

2006

HORIZONTAL
DIRECTION
DRILLING

HDD and Auger Boring Works for Mora-Vapi Pipeline Project in Valsad Region of Gujarat State in India. Terrain included Clay, Rock and Sand in various parts.

Client:
Larsen & Toubro Limited
Owner:
Gas Authority of India Limited

2008

Dahejuran
pipeline
project

Boring works of 30″ pipes

Client:
Essar Construction
Owner:
Gas Authority of India Ltd.

2008-2009

Barmer Salaya
pipeline project

Auger boring works of 12″, 24″, 40″ & 52″ pipes

Client:
L & T Ltd, H & P Division
Owner:
Cairn

2009-2010

Agra-Ferozabad pipeline

Auger boring works of 12″,24″,40″ pipes

Client:
Kalpataru Power Transmission Ltd.
Owner:
Gas Authority of India ltd.

2010-2013

Salaya Bhogat
pipeline project

Auger auger boring works of 12″, 24″, 40″ and 52″ pipes

Client:
L & T Ltd, H & P Division
Owner:
Cairn Energy

2011

AUGER BORING
WORKS

Auger Boring works of 12″,24″,40″& 52″ pipes as part of Salaya Bhogat Pipeline Project in Gujarat, India

Client:
Larsen & Toubro Limited
Owner:
Cairn Energy

2011-2012

Water Pipeline-IOCL

Laying of casing pipe (with augur boring method)
Scope of work involves mobilization of manpower resource, hydralic pushing system , quantity assment of the boring required in the rail / road crossing , excavation of driving pit, receiving pit, construction of driver pit wall, augering / boring, fabrcation & installation of vent & drain pipe, supply & installation of end seal insulator, sand blasting, epoxy painting , laying, jointing / welding of pipe,quality inspection & HSE management at various location of railway and road crossings in the IOCL project.

Client:
Lanco Infrastructure Ltd.
Owner:
Indian Oil Corporation Ltd.

2015

CIVILS

Earthworks and Foundations for Equipment as part of Refinery Capacity Expansion Project in Atyrau, Kazakhstan

Client:
Sinopec Engineering
Owner:
Atyrau Refinery

2015

Atyrau refinery expansion project

Concreting:
Supply of materials, construction engineering, materials management, quality inspection, HSE management, excavation, steel reinforcement, form works, concreting, back filling, consolidation, structural steel fabrication and erection.

Client::
Sinopec Engineering Group

Owner:
Atyrau Refinery LLP

2015

Beineu Bozoi Shymkent gas pipeline project

Welding and drying:
Welding and drying of 42” gas pipeline in the 23 ball valve stations and 4 pig trap stations between the chainages 882.6 Km to 1,454.2 Km as part of pre – commissioning / commissioning works. IDP mobilized manpower, necessary equipment, preparation of quality control procedures and as built documentation

Client::
Kaz Stroy Service JSC

Owner:
Beineu Shymkent Gas Pipeline LLP

2015

Beineu Bozoi Shymkent gas pipeline project

Nitrogen purging:
Nitrogen purging in gas pipeline including mobilization of manpower and equipment, supply of nitrogen gas, filling up the nitrogen gas and carrying out purging in the pipelines, quality inspection and HSE management

Client::
Kaz Stroy Service JSC

Owner:
Beineu Shymkent Gas Pipeline LLP

2016

ASSET
MANAGEMENT

Implementation of an Asset Management Sysytem for Asian Gas Pipeline in Consortium with Huawei

Client & оwner::
Asian Gas Pipeline

2016

Eskene west non-rail project

Bolt torqueing and tensioning:
Complete project management of bolt torqueing requirements from start to finish, including the tightening procedures, bolt tightening, ensure accurate bolt loading, directing load evenly across all bolts, eliminating the factors introduced with bolt torquing, accessing gaskets in all types of flanged connections, leak free jointing of bolted connections and post job reporting

Client::
Isker Consortium

Owner:
North Caspian Operating Company

2016

Eskene west non-rail project

Supervision, pre-commissioning and commissioning:
Construction supervision of:
 the installation of various static / rotating equipments
 the pipe welding and installation the structural steel fabrication and installation
 the field instruments, control valves, cables
 Hydro testing of piping including project management, test pack compilation, total flange management, controlled bolting, air blowing and drying

Client::
Isker Consortium

Owner:
North Caspian Operating Company

2016-17

Asian Gas Pipeline

Asset management system:
Provision of equipment and asset management system based on IBM-Maximo platform including site survey, procedure analysis, function development, data acquisition, mobile application development, hardware deployment and user training.

Client::
Asia Gas Pipeline LLP

Owner:
Asia Gas Pipeline LLP (CNPC&KMG)

2016-17

Eskene west non-rail project

Chemical cleaning:
Procurement and supply of chemicals, test kits, chemical preparation, passivation, chemical cleaning, etc. Preparation of temporary circuits, arrangement of pumps, piping, valves, and tanks etc. for the chemical cleaning and passivation. Arrangement of demineralized water and air, etc. Monitoring the chemical cleaning operation at site.

Client::
Isker Consortium

Owner:
North Caspian Operating Company

2016-17

Eskene west non-rail project

Leak testing:
Providing marked-up P & ID’s indicating test pack boundary limits, provision of isolation valve list / critical valve list, preparation of test packs, tagging, injection point, monitoring point, line walking, introduction of N2He gas into system, perform probing to check for any potential leak points, leak description report, rectification of leak points and handover of test package dossier

Client::
Isker Consortium

Owner:
North Caspian Operating Company

2017

COMMISSIONING

26 MW Diesel Power Generators Repair and Commissioning for Copper Mining Plant in Boshakol, Kazakhstan

Client & оwner::
Kaz Minerals

2017-18

Repair, maintenance of diesel generators

Maintenance of 13 nos. of generators: Inspect, identify the defects, supply of spares, commissioning, parallel operation, continuous trial run for 72 hours, test the auto restart of each generator, operation and maintenance of 13 nos. of diesel generators for 12 months.

Client::
Kaz Minerals Boshakol LLP

Owner:
Kaz Minerals Boshakol LLP

2018

Plant Shutdown

Welding works
Welding work carried out during shutdown

Client::
Arcellor Mittal Temirtau

Owner:
Arcellor Mittal Temirtau

2018

EPC-4

Testing and commissioning:
Tubing reel hydrostatic testing with pressures ranging from 600 to 1900 bar, nitrogen leakage test, hot oil flushing and pre-commissioning of EPC4 offshore modules.

Client::
Kazakhstan Caspian Offshore Industries LLP

Owner:
NCOC

2018

Finished.

TESTING AND
PRE-COMISSIONING WORKS
AKTAU, 2018

Kazakhstan Caspian Offshore Industries (KCOI) awarded IDP the full spectrum of Testing and Commissioning Works for the Offshore Modules as part of the EPC-04 project for NCOC.

Scope included Hydrotesting of Pipe Spools at Pressures ranging between 600 bar to 1900 bar; Hot Oil Flushing; Nitrogen Leak Testing and other Pre-Commissioning works

2018

in progress…

MAINTAINING SERVICES
AT ORKEN VILLAGE

Maintenance of Power Generation and other associated Equipment in Orken Village Construction Project for TCO in Tengiz, Kazakhstan

2018-22

Future growth project

Installation and pre-commissioning of mechanical, electrical, instrumentation equipment such as flare stacks, knock out drums, storage tanks, pressure vessels, pumps, deluge skids, breathing air package, pig launcher & receiver, slug catcher, transformer, electrical switchboards, UPS and control panels etc. (ongoing project)

Client::
Velesstroy LLC

Owner:
Tengiz Chevroil LLP

2018-22

Isker 2

Provision of qualified personnel for project purposes, maintenance and repair of equipment – team – 3 people, 2 watch

Client::
Isker Consortium

Owner:
Isker Consortium

2018-22

Orken Village – Operation, servicing and rental of construction equipment

Provision of equipment for rent: – 23 units of diesel generators ranging from 110 kVA to 410 kVA. – 9 units of lighting masts

Client::
Isker Consortium

Owner:
Tengiz Chevroil LLP

2019

Sary Arka gas pipeline project

Horizontal directional drilling through river, road and railroad crossings.

Client::
Kaz Stroy Service JSC

Owner:
Astana Gas LLP

2019-22

Orken Village

Provision of various process services:
WO 1 – Hydrotesing and pigging of fuel underground pipelines from TCO substation tie point to lay down station and from lay down station to Orken Village valve box
WO 2 – Provision of personnel for material preservation works
WO 3 – Hydrotesting of various pipelines
WO 4 – Hydrotesting of fire water tanks
WO 5 – temporary provision of rigid pipe threading machines
WO 6 – Provision of ethylene glycol
WO 7 – Flushing SOW
WO 8 – Supply of various material for pipe flushing materials at IOCC
WO 9 – Portable water system disinfection
WO 10 – temporary provision of rigid pipe threading machines
WO 11 – Portable water system disinfection/flushing from manhole 50- MH-WD-012 to the Utility building
WO 12 – Torqueing of bolted connections at the FW system main ring
WO 13 – Personnel compensations related to measures due to Covid -19
WO 14 – Flushing scope of work
WO 15 – Alignment of equipment
WO 16 – Hydrotesting of various pipelines
WO 17 – Leak testing of the fuel gas system
WO 18 – Testing of copper work associated with AHU`s and CRAC units within the OV Data Center
WO 19 – Portable Water System Disinfection/Flushing from Utility Corridor to the Data Center
WO 20 – Provision of flange facing equipment and operator
WO 21 – Personnel compensation
WO 22 – Provision of flange weld test equipment and operator
WO 23 – Flushing of various pipelines
WO 24 – Personnel compensation

Client::
Isker Consortium

Owner:
Isker Consortium

2019-24

Future growth project

Inspection and preservation of mechanical, electrical, instrumentation equipment such as motors, compressors, jacks, pumps, valves, heat exchangers, control panels, pressure vessels etc. (ongoing project)

Client::
Tengiz Chevroil LLP

Owner:
Tengiz Chevroil LLP

2021

Karabatan Project

Provision of valve testing, verification and calibration services. Total number of valves for testing – 318pcs.

Client::
RMS LLP

Owner:
NCOC N.V.

2021

Dunga Project

Provision of hydrotesting services and nitrogen purging on call off basis

Client::
KazTurboRemont LLP

Owner:
Total Energies Kazakhstan

2022

Orken Village

Maintenance and management of equipment with procurement of spare parts and fuel supply (ongoing project)

Client::
KazTurbo Remont LLP

Owner:
Tengiz Chevroil LLP

2022

Orken Village

Rental of diesel generators (4 units 110 – 410 kVA) and fuel supply (2 x 1250kVa generators and 2 x Boilers) (ongoing project)

Client::
KazTurbo Remont LLP

Owner:
Tengiz Chevroil LLP

2022

Orken Village

Provision of various process services: (ongoing project)
• WO 1 – Alignment of the equipment
• WO 2 – Flushing of various pipelines
• WO 3 – Hydrotesting of various pipelines
• WO 4 – Provision of Borescope instrument
• WO 5 – Temporary provision of Ridgid pipe threading machines
• WO 6 – Testing of copper work associated with AHU’sand CRAC units within the OV Data Center
• WO 7 – Torqueing of bolted connections at the FW system main ring.

Client::
KazTurbo Remont LLP

Owner:
Tengiz Chevroil LLP

2022

Orken Village

Rental of diesel generators (4 Units) and fuel supply for equipment (ongoing project)

Client::
KENT PLC.

Owner:
Tengiz Chevroil LLP

2022

Kashagan

Provision of engineering equipment and compressor alignment service

Client::
Isker Consortium

Owner:
NCOC N.V.

2022

Kashagan

Rental of 11 x generators and 15 x Lightning masts

Client::
Isker Consortium

Owner:
NCOC N.V.

2022

WTP / 1BCMA

WO 2 – Hydrotest of the lines
WO 3 – Hydro testing and pneumatic testing of pipe and pile spools at the Western base

Client::
Isker Consortium

Owner:
NCOC N.V.

2022

3GI – Tengiz

Lube oil flushing of Compressors M261 and M262

Client::
Velesstroy LLC

Owner:
Tengiz Chevroil LLP

INFRA DEL PROJECTS RUS LLC, Russia

2020-23

Amur Gas Processing Plant

Installation and welding of the process pipeline

Client:
JSC «Yamata Yatirim Insaat Turizm ve Ticaret Anonim Sirketi»

Owner:
JSC «Nipigasperera botka»

2021

Amur Gas Processing Plant

Complex of works on welding and installation of technological pipelines at the plant (Technological line No. 4)

Client:
“VelesstroySMU” LLC

Owner:
JSC Nipigaz

INFRA DEL PROJECTS PRIVATE LIMITED, India

2002

Mumbai Manmad pipeline extension project, Spread-1

i) Sectionalization valve station building construction 3 nos.
ii) Pipeline markers fabrication and installation sectionalization valve

Client:
Punj Lloyd Ltd.

Owner:
Bharat Petroleum Corporation Ltd. / Engineers India Ltd.

2019

HORIZONTAL DIRECTION
DRILLING
NUR-SULTAN, 2019

Idp was awadred an important scope for performing the Horizontal Direction Drilling across several crossings that included Major Interstate Highways, Railways, Canals and Rivers. Pipline sizes of 1020 mm and 820 mm diameter were pulled through challenging Terrain conditions.

2019

In progress …

EQUIPMENT ERECTION
TENGIZ, 2019

As part of it’s Future Growth Project, TCO has engaged several EPC contractors for execution of it’s various components and stages. IDP has secured a contract under one of these EPC contractors – Velesstroy.

The scope entrusted to IDP involves Erection and Installation of Mechanical and Electrical Equipment packages of various sizes and weights including Flare stacks, Vessels, Transformers and others.

2019

In progress …

PRESERVATION
WORKS
TENGIZ, 2019

TCO entrusted IDP with Preservation works of its Equipment and Materials in it’s Tengiz Warehouse facilities.

Scopes included simple and Complex Preservation activities performed through a team of highly skilled experts and with specilised tools and equipment.

2020

In progress …

WELDING
WORKS
AMUR, 2020

Construction phase of Amur Gas Processing Plant Project (AGPP), located in Svobodny, Amur, Russia. AGPP is slated to be one of the largest natural gas processing plants in the world. IDP’s scope involves Piping & Structural works. Presently 300 of IDP’s highly skilled manpower are involved in this project and the numbers are expected to increase.