In May, IDP signed a new contract with SICIM for horizontal directional drilling. The work will be carried out at the Tengiz field. The total drilling length will be 300 m with a maximum immersion depth of 5 m.
In May, IDP signed a new contract with SICIM for horizontal directional drilling. The work will be carried out at the Tengiz field. The total drilling length will be 300 m with a maximum immersion depth of 5 m.