IDP has successfully executed close to 100 contracts over a span of 17 years in India and Kazakhstan.
A few sample selected projects for some of IDP’s prestigious Clients are listed below showcasing IDP’s wide capability range:
IDP has successfully executed close to 100 contracts over a span of 17 years in India and Kazakhstan.
A few sample selected projects for some of IDP’s prestigious Clients are listed below showcasing IDP’s wide capability range:
SERVICE
СATEGORY
PROJECT AND SCOPE
DESCRIPTION
CLIENTS /
CONSULTANTS
2002
CIVIL,
MECHANICAL &
PIPING
Receiver — Launcher and Valve Station Construction Works involving Civil, Mechanical and Piping scopes for Mumbai — Manmad Extension project
Client:
Punj Lloyd Limited
Owner:
Bharat Petroleum Corporation Limited
Consultant:
Engineers India Limited
2003
CIVIL
Civil works in Effluent Disposal Glass Reinforced Line including Earth Works, Foundations, Thrust Blocks and other miscellaneous scopes
Client:
Aban Construction Private Limited
Owner:
Bharat Petroleum Corporation Limited
2004
HYDROTESTING
Testing of 16 inch Cross Country Pipeline in Mountaneous terraain with elevation differnces of 9500 meters for Vizag Bailadela Iron Ore Slurry Pipeline
Client:
Essar Construction
Owner:
Hydrate Pellets Limited
2005
CROSS-COUNTRY
PIPELINE
Cross-Country pipeline laying including Survey,Right of Way Grading, Stringing, Welding, NDT, Lowering, Backfilling and Restoration Narimanam-Kottalm Pipeline project, Tamil Nadu, India
Client:
Aban Construction Pvt. Ltd.
Owner:
Gas Authority of India Limited
Consultant:
Engineers India Limited
2006
HORIZONTAL
DIRECTION
DRILLING
HDD and Auger Boring Works for Mora-Vapi Pipeline Project in Valsad Region of Gujarat State in India. Terrain included Clay, Rock and Sand in various parts.
Client:
Larsen & Toubro Limited
Owner:
Gas Authority of India Limited
2008
Dahejuran
pipeline
project
Boring works of 30″ pipes
Client:
Essar Construction
Owner:
Gas Authority of India Ltd.
2008-2009
Barmer Salaya
pipeline project
Auger boring works of 12″, 24″, 40″ & 52″ pipes
Client:
L & T Ltd, H & P Division
Owner:
Cairn
2009-2010
Agra-Ferozabad pipeline
Auger boring works of 12″,24″,40″ pipes
Client:
Kalpataru Power Transmission Ltd.
Owner:
Gas Authority of India ltd.
2010-2013
Salaya Bhogat
pipeline project
Auger auger boring works of 12″, 24″, 40″ and 52″ pipes
Client:
L & T Ltd, H & P Division
Owner:
Cairn Energy
2011
AUGER BORING
WORKS
Auger Boring works of 12″,24″,40″& 52″ pipes as part of Salaya Bhogat Pipeline Project in Gujarat, India
Client:
Larsen & Toubro Limited
Owner:
Cairn Energy
2011-2012
Water Pipeline-IOCL
Laying of casing pipe (with augur boring method)
Scope of work involves mobilization of manpower resource, hydralic pushing system , quantity assment of the boring required in the rail / road crossing , excavation of driving pit, receiving pit, construction of driver pit wall, augering / boring, fabrcation & installation of vent & drain pipe, supply & installation of end seal insulator, sand blasting, epoxy painting , laying, jointing / welding of pipe,quality inspection & HSE management at various location of railway and road crossings in the IOCL project.
Client:
Lanco Infrastructure Ltd.
Owner:
Indian Oil Corporation Ltd.
2015
CIVILS
Earthworks and Foundations for Equipment as part of Refinery Capacity Expansion Project in Atyrau, Kazakhstan
Client:
Sinopec Engineering
Owner:
Atyrau Refinery
2015
Atyrau refinery expansion project
Concreting:
Supply of materials, construction engineering, materials management, quality inspection, HSE management, excavation, steel reinforcement, form works, concreting, back filling, consolidation, structural steel fabrication and erection.
Client::
Sinopec Engineering Group
Owner:
Atyrau Refinery LLP
2015
Beineu Bozoi Shymkent gas pipeline project
Welding and drying:
Welding and drying of 42” gas pipeline in the 23 ball valve stations and 4 pig trap stations between the chainages 882.6 Km to 1,454.2 Km as part of pre – commissioning / commissioning works. IDP mobilized manpower, necessary equipment, preparation of quality control procedures and as built documentation
Client::
Kaz Stroy Service JSC
Owner:
Beineu Shymkent Gas Pipeline LLP
2015
Beineu Bozoi Shymkent gas pipeline project
Nitrogen purging:
Nitrogen purging in gas pipeline including mobilization of manpower and equipment, supply of nitrogen gas, filling up the nitrogen gas and carrying out purging in the pipelines, quality inspection and HSE management
Client::
Kaz Stroy Service JSC
Owner:
Beineu Shymkent Gas Pipeline LLP
2016
ASSET
MANAGEMENT
Implementation of an Asset Management Sysytem for Asian Gas Pipeline in Consortium with Huawei
Client & оwner::
Asian Gas Pipeline
2016
Eskene west non-rail project
Bolt torqueing and tensioning:
Complete project management of bolt torqueing requirements from start to finish, including the tightening procedures, bolt tightening, ensure accurate bolt loading, directing load evenly across all bolts, eliminating the factors introduced with bolt torquing, accessing gaskets in all types of flanged connections, leak free jointing of bolted connections and post job reporting
Client::
Isker Consortium
Owner:
North Caspian Operating Company
2016
Eskene west non-rail project
Supervision, pre-commissioning and commissioning:
Construction supervision of:
the installation of various static / rotating equipments
the pipe welding and installation the structural steel fabrication and installation
the field instruments, control valves, cables
Hydro testing of piping including project management, test pack compilation, total flange management, controlled bolting, air blowing and drying
Client::
Isker Consortium
Owner:
North Caspian Operating Company
2016-17
Asian Gas Pipeline
Asset management system:
Provision of equipment and asset management system based on IBM-Maximo platform including site survey, procedure analysis, function development, data acquisition, mobile application development, hardware deployment and user training.
Client::
Asia Gas Pipeline LLP
Owner:
Asia Gas Pipeline LLP (CNPC&KMG)
2016-17
Eskene west non-rail project
Chemical cleaning:
Procurement and supply of chemicals, test kits, chemical preparation, passivation, chemical cleaning, etc. Preparation of temporary circuits, arrangement of pumps, piping, valves, and tanks etc. for the chemical cleaning and passivation. Arrangement of demineralized water and air, etc. Monitoring the chemical cleaning operation at site.
Client::
Isker Consortium
Owner:
North Caspian Operating Company
2016-17
Eskene west non-rail project
Leak testing:
Providing marked-up P & ID’s indicating test pack boundary limits, provision of isolation valve list / critical valve list, preparation of test packs, tagging, injection point, monitoring point, line walking, introduction of N2He gas into system, perform probing to check for any potential leak points, leak description report, rectification of leak points and handover of test package dossier
Client::
Isker Consortium
Owner:
North Caspian Operating Company
2017
COMMISSIONING
26 MW Diesel Power Generators Repair and Commissioning for Copper Mining Plant in Boshakol, Kazakhstan
Client & оwner::
Kaz Minerals
2017-18
Repair, maintenance of diesel generators
Maintenance of 13 nos. of generators: Inspect, identify the defects, supply of spares, commissioning, parallel operation, continuous trial run for 72 hours, test the auto restart of each generator, operation and maintenance of 13 nos. of diesel generators for 12 months.
Client::
Kaz Minerals Boshakol LLP
Owner:
Kaz Minerals Boshakol LLP
2018
Plant Shutdown
Welding works
Welding work carried out during shutdown
Client::
Arcellor Mittal Temirtau
Owner:
Arcellor Mittal Temirtau
2018
EPC-4
Testing and commissioning:
Tubing reel hydrostatic testing with pressures ranging from 600 to 1900 bar, nitrogen leakage test, hot oil flushing and pre-commissioning of EPC4 offshore modules.
Client::
Kazakhstan Caspian Offshore Industries LLP
Owner:
NCOC
2018
Finished.
Kazakhstan Caspian Offshore Industries (KCOI) awarded IDP the full spectrum of Testing and Commissioning Works for the Offshore Modules as part of the EPC-04 project for NCOC.
Scope included Hydrotesting of Pipe Spools at Pressures ranging between 600 bar to 1900 bar; Hot Oil Flushing; Nitrogen Leak Testing and other Pre-Commissioning works
2018
in progress…
Maintenance of Power Generation and other associated Equipment in Orken Village Construction Project for TCO in Tengiz, Kazakhstan
2018-22
Future growth project
Installation and pre-commissioning of mechanical, electrical, instrumentation equipment such as flare stacks, knock out drums, storage tanks, pressure vessels, pumps, deluge skids, breathing air package, pig launcher & receiver, slug catcher, transformer, electrical switchboards, UPS and control panels etc. (ongoing project)
Client::
Velesstroy LLC
Owner:
Tengiz Chevroil LLP
2018-22
Isker 2
Provision of qualified personnel for project purposes, maintenance and repair of equipment – team – 3 people, 2 watch
Client::
Isker Consortium
Owner:
Isker Consortium
2018-22
Orken Village – Operation, servicing and rental of construction equipment
Provision of equipment for rent: – 23 units of diesel generators ranging from 110 kVA to 410 kVA. – 9 units of lighting masts
Client::
Isker Consortium
Owner:
Tengiz Chevroil LLP
2019
Sary Arka gas pipeline project
Horizontal directional drilling through river, road and railroad crossings.
Client::
Kaz Stroy Service JSC
Owner:
Astana Gas LLP
2019-22
Orken Village
Provision of various process services:
WO 1 – Hydrotesing and pigging of fuel underground pipelines from TCO substation tie point to lay down station and from lay down station to Orken Village valve box
WO 2 – Provision of personnel for material preservation works
WO 3 – Hydrotesting of various pipelines
WO 4 – Hydrotesting of fire water tanks
WO 5 – temporary provision of rigid pipe threading machines
WO 6 – Provision of ethylene glycol
WO 7 – Flushing SOW
WO 8 – Supply of various material for pipe flushing materials at IOCC
WO 9 – Portable water system disinfection
WO 10 – temporary provision of rigid pipe threading machines
WO 11 – Portable water system disinfection/flushing from manhole 50- MH-WD-012 to the Utility building
WO 12 – Torqueing of bolted connections at the FW system main ring
WO 13 – Personnel compensations related to measures due to Covid -19
WO 14 – Flushing scope of work
WO 15 – Alignment of equipment
WO 16 – Hydrotesting of various pipelines
WO 17 – Leak testing of the fuel gas system
WO 18 – Testing of copper work associated with AHU`s and CRAC units within the OV Data Center
WO 19 – Portable Water System Disinfection/Flushing from Utility Corridor to the Data Center
WO 20 – Provision of flange facing equipment and operator
WO 21 – Personnel compensation
WO 22 – Provision of flange weld test equipment and operator
WO 23 – Flushing of various pipelines
WO 24 – Personnel compensation
Client::
Isker Consortium
Owner:
Isker Consortium
2019-24
Future growth project
Inspection and preservation of mechanical, electrical, instrumentation equipment such as motors, compressors, jacks, pumps, valves, heat exchangers, control panels, pressure vessels etc. (ongoing project)
Client::
Tengiz Chevroil LLP
Owner:
Tengiz Chevroil LLP
2021
Karabatan Project
Provision of valve testing, verification and calibration services. Total number of valves for testing – 318pcs.
Client::
RMS LLP
Owner:
NCOC N.V.
2021
Dunga Project
Provision of hydrotesting services and nitrogen purging on call off basis
Client::
KazTurboRemont LLP
Owner:
Total Energies Kazakhstan
2022
Orken Village
Maintenance and management of equipment with procurement of spare parts and fuel supply (ongoing project)
Client::
KazTurbo Remont LLP
Owner:
Tengiz Chevroil LLP
2022
Orken Village
Rental of diesel generators (4 units 110 – 410 kVA) and fuel supply (2 x 1250kVa generators and 2 x Boilers) (ongoing project)
Client::
KazTurbo Remont LLP
Owner:
Tengiz Chevroil LLP
2022
Orken Village
Provision of various process services: (ongoing project)
• WO 1 – Alignment of the equipment
• WO 2 – Flushing of various pipelines
• WO 3 – Hydrotesting of various pipelines
• WO 4 – Provision of Borescope instrument
• WO 5 – Temporary provision of Ridgid pipe threading machines
• WO 6 – Testing of copper work associated with AHU’sand CRAC units within the OV Data Center
• WO 7 – Torqueing of bolted connections at the FW system main ring.
Client::
KazTurbo Remont LLP
Owner:
Tengiz Chevroil LLP
2022
Orken Village
Rental of diesel generators (4 Units) and fuel supply for equipment (ongoing project)
Client::
KENT PLC.
Owner:
Tengiz Chevroil LLP
2022
Kashagan
Provision of engineering equipment and compressor alignment service
Client::
Isker Consortium
Owner:
NCOC N.V.
2022
Kashagan
Rental of 11 x generators and 15 x Lightning masts
Client::
Isker Consortium
Owner:
NCOC N.V.
2022
WTP / 1BCMA
WO 2 – Hydrotest of the lines
WO 3 – Hydro testing and pneumatic testing of pipe and pile spools at the Western base
Client::
Isker Consortium
Owner:
NCOC N.V.
2022
3GI – Tengiz
Lube oil flushing of Compressors M261 and M262
Client::
Velesstroy LLC
Owner:
Tengiz Chevroil LLP
INFRA DEL PROJECTS RUS LLC, Russia
2020-23
Amur Gas Processing Plant
Installation and welding of the process pipeline
Client:
JSC «Yamata Yatirim Insaat Turizm ve Ticaret Anonim Sirketi»
Owner:
JSC «Nipigasperera botka»
2021
Amur Gas Processing Plant
Complex of works on welding and installation of technological pipelines at the plant (Technological line No. 4)
Client:
“VelesstroySMU” LLC
Owner:
JSC Nipigaz
INFRA DEL PROJECTS PRIVATE LIMITED, India
2002
Mumbai Manmad pipeline extension project, Spread-1
i) Sectionalization valve station building construction 3 nos.
ii) Pipeline markers fabrication and installation sectionalization valve
Client:
Punj Lloyd Ltd.
Owner:
Bharat Petroleum Corporation Ltd. / Engineers India Ltd.
2019
Idp was awadred an important scope for performing the Horizontal Direction Drilling across several crossings that included Major Interstate Highways, Railways, Canals and Rivers. Pipline sizes of 1020 mm and 820 mm diameter were pulled through challenging Terrain conditions.
2019
In progress …
As part of it’s Future Growth Project, TCO has engaged several EPC contractors for execution of it’s various components and stages. IDP has secured a contract under one of these EPC contractors – Velesstroy.
The scope entrusted to IDP involves Erection and Installation of Mechanical and Electrical Equipment packages of various sizes and weights including Flare stacks, Vessels, Transformers and others.
2019
In progress …
TCO entrusted IDP with Preservation works of its Equipment and Materials in it’s Tengiz Warehouse facilities.
Scopes included simple and Complex Preservation activities performed through a team of highly skilled experts and with specilised tools and equipment.
2020
In progress …
Construction phase of Amur Gas Processing Plant Project (AGPP), located in Svobodny, Amur, Russia. AGPP is slated to be one of the largest natural gas processing plants in the world. IDP’s scope involves Piping & Structural works. Presently 300 of IDP’s highly skilled manpower are involved in this project and the numbers are expected to increase.